I have a theory. 4 days from 9/25 is 9/29. On 9/29/(20), VK had the header change to pic 1. On very close inspection, that change revealed a โ<7โ in the background, shown in pic 2.
On 9/29, will we be less than 7 days away from something???
10/4 is the scheduled EBS test.